This resource is no longer available
Deliver timely information to customers by achieving high availability of business-critical production systems.
Mitigate the risks of losing approximately $1,000 (U.S.) per minute due to downtime on assembly lines.
Comply with data protection and regulatory requirements.
Minimize disruption to manufacturing operations.
These were the challenges with which auto manufacturer Astra Daihatsu Motor was contending—but soon they found the light at the end of the tunnel.
Download this case study to find out how Astra Daihatsu overcame these previous issues with Commvault’s Complete Backup & Recovery and the 4 benefits they realized as a result.