This resource is no longer available

Case Study - Golder Associates Implements Riverbed Products - Accelerates SharePoint

Cover

To coordinate project activities and share project data, the engineering and environmental services firm Golder Associates deployed Microsoft SharePoint 2010, centralized in its Seattle-area data center.

But despite installing WAN optimization appliances at every one of 160 global offices, it was taking way too long to download SharePoint pages in remote locations like Asia, Australia and South Africa, especially when they contained a lot of content. To Golder's frustration, the slow page loads were discouraging the use of SharePoint.

Read this case study to learn how web content optimization software helped Golder:

  • Dramatically accelerate SharePoint page load times for all global users
  • Reduce page load times in Johannesburg from up to 55 seconds to as little as two to four seconds
  • Avoid the considerable cost of a content mirroring service
  • Encourage the use of SharePoint
  • And more.
Vendor:
Riverbed Stingray
Posted:
04 Feb 2013
Published:
04 Feb 2013
Format:
PDF
Length:
2 Page(s)
Type:
Case Study
Language:
English

This resource is no longer available.